Data used in the analyses below (ecological condition, threat status, protection, distribution of activities, cumulative pressure from activities) are from the National Biodiversity Assessment 2018: Marine Realm Assessment. See the NBA 2018 website for access to the report.

 

EBSA Status Assessment and Management Recommendations

Ecological Condition, Threat Status, Current Protection and Key Features in the EBSA

Relevant Pressures and Activities (impact, extent) | Management Interventions Needed for the EBSA

Activity Evaluation Per Zone: Zoning Feasibility | Management recommendations for MPAs

Management recommendations for MSP | Research Needs & Future Process

EBSA report download | Back to the SA EBSA status and management home page

 

 

EBSA overview

Protea Banks and Sardine Route encompasses a culturally and ecologically significant annual phenomenon: the sardine run, which provides a seasonal foraging extravaganza for a plethora of top predators, many of which are threatened species. Protea Banks itself is a unique deep-reef system that supports aggregations and spawning of fish. Diversity is exceptional, with 40 ecosystem types: the most of all South African EBSAs.

Click here for the full EBSA description

[Top]

Ecological Condition, Threat Status, Current Protection and Key Features in the EBSA

Protea Banks and Sardine Route has a myriad of features, processes and ecosystem types that need to be protected for the area to maintain the characteristics that give it its EBSA status. The criteria for which this EBSA ranks highly are: uniqueness and rarity, importance for life history stages, importance for threatened species and habitats, and biological diversity. There are 40 ecosystem types represented, which is the most habitat diversity in all of South Africa’s EBSAs; half of these ecosystem types (2) are threatened. The reefs, rocky shores, rocky shelf, steep shelf edge and canyon ecosystem types all support fragile species that are sensitive to damage. Further, the area is an important part of the annual sardine run, where sardines migrate from west to east, followed by a plethora of top predators that forage on the fish.

 

Protea Banks and Sardine Route proportion of area in each ecological condition category.

 

Protea Banks and Sardine Route is largely in good ecological condition (62%), with a third that is in fair ecological condition (33%), and a fraction (5%) that is in poor ecological condition. Consequently, the bulk of the EBSA is Near Threatened (74%). The remaining quarter is split among Endangered (12%), Vulnerable (7%) and Near Threatened (7%) types that are all coastal.

 

Protea Banks and Sardine Route proportion of area in each ecosystem threat status category.

 

Protea Banks and Sardine Route proportion of area in a Marine Protected Area (MPA).

 

Although some areas within the EBSA have been protected in MPAs for a long time, this has been considerably expanded and strengthened following the proclamation of the Operation Phakisa MPA network, with the EBSA area within reserves more than doubling from 17% to 37%. Although most of the ecosystem types in this area are now well or moderately protected, there are still some that are poorly or not protected.

 

Threat status, protection level and ecological condition of ecosystem types in the EBSA. Other key features are also listed.

Feature

Threat Status

Protection Level

Condition (%)

Good

Fair

Poor

Ecosystem Types

Agulhas Dissipative Intermediate Sandy Shore

LC

WP

0.0

100.0

0.0

Agulhas Dissipative Sandy Shore

NT

WP

57.9

35.0

7.1

Agulhas Exposed Rocky Shore

VU

MP

66.9

32.9

0.2

Agulhas Mixed Shore

NT

MP

66.9

32.6

0.5

Agulhas Very Exposed Rocky Shore

VU

MP

98.4

1.6

0.0

Aliwal Shoal Reef Complex

VU

MP

0.0

70.7

29.3

Natal Boulder Shore

VU

WP

38.1

14.6

47.3

Natal Deep Shelf Edge

LC

MP

49.2

50.7

0.1

Natal Delagoa Dissipative Intermediate Sandy Shore

LC

WP

34.1

32.2

33.7

Natal Delagoa Dissipative Sandy Shore

NT

NP

46.4

45.1

8.5

Natal Delagoa Intermediate Sandy Shore

NT

WP

10.9

13.9

75.2

Natal Delagoa Reflective Sandy Shore

VU

WP

0.0

3.1

96.9

Natal Exposed Rocky Shore

NT

WP

52.7

19.8

27.5

Natal Lower Canyon

LC

WP

83.3

16.7

0.0

Natal Mixed Shore

VU

WP

25.4

20.7

53.9

Natal Upper Canyon

LC

WP

79.7

20.3

0.0

Natal Very Exposed Rocky Shore

NT

WP

48.4

43.4

8.2

Port St Johns Inner Shelf Mosaic

VU

MP

0.2

89.1

10.8

Port St Johns Muddy Mid Shelf

VU

MP

0.0

100.0

0.0

Port St Johns Muddy Shelf Edge

VU

MP

0.1

99.9

0.0

Protea Mid Shelf Reef Complex

EN

MP

0.0

100.0

0.0

Southern KZN Shelf Edge Mosaic

NT

WP

37.3

62.5

0.2

Southern KZN Inner Shelf Mosaic

EN

MP

0.0

0.9

99.1

Southern KZN Mid Shelf Mosaic

EN

MP

0.0

84.2

15.8

Southwest Indian Lower Slope

LC

NP

85.4

14.6

0.0

Southwest Indian Mid Slope

LC

PP

81.8

18.2

0.0

Southwest Indian Upper Slope

LC

WP

79.2

20.8

0.0

Subtropical Large Fluvially Dominated

EN

PP

57.6

32.6

9.9

Subtropical Large Temporarily Closed

EN

PP

12.5

29.6

58.0

Subtropical Micro-estuary

NA

NA

45.1

31.5

23.4

Subtropical Predominantly Open

EN

MP

30.7

48.0

21.3

Subtropical Small Temporarily Closed

VU

MP

25.7

35.3

39.0

Trafalgar Reef Complex

EN

MP

0.0

0.1

99.9

Warm Temperate Large Temporarily Closed

VU

PP

99.4

0.6

0.0

Warm Temperate Micro-estuary

NA

NA

99.5

0.5

0.0

Warm Temperate Predominantly Open

VU

PP

0.0

100.0

0.0

Warm Temperate Small Temporarily Closed

LC

PP

1.9

98.1

0.0

Wild Coast Inner Shelf Mosaic

VU

MP

0.8

92.6

6.6

Wild Coast Mid Shelf Mosaic

LC

WP

71.8

26.5

1.8

Wild Coast Shelf Edge Mosaic

LC

WP

94.8

5.2

0.0

Other Features

  • Sardine run, and associated following by top predators
  • Unique deep-reef system that supports aggregations and spawning of fish, and fragile species
  • Canyons

[Top]

 

Relevant Pressures and Activities (impact, extent)

  • There are 13 pressures present in this EBSA, of which shipping is the only one that covers the entire EBSA extent and has the highest cumulative pressure profile.
  • Key pressures in this EBSA that most directly impact the features for which the EBSA is described include: linefishing (commercial and recreational), mean annual runoff reduction, shark netting, coastal disturbance, coastal development, wastewater discharge, recreational shore angling, subsistence harvesting, pelagic longlining, oyster harvesting and abalone harvesting. These activities cover discrete portions of the EBSA, and are mostly concentrated in the shallower waters, particularly along the shore. These activities will need to be managed particularly well in order to protect the coastal (especially shore) ecosystem types, and fish and top predator assemblages (especially during the sardine run) for which this EBSA is recognised. In some cases, this is already true, e.g., the shark nets are lifted during the sardine run.
  • Nine of the 13 pressures each comprise <1% of the EBSA pressure profile, including: coastal disturbance, coastal development, wastewater discharge, recreational shore angling, subsistence harvesting, pelagic longlining, oyster harvesting, mining (prospecting and mining) and abalone harvesting. This is expected because most of these are coastal pressures that have a very small footprint relative to the size of the EBSA, but that can substantially overlap with and impact the small extent of the ecosystem types in which they occur (e.g., rocky shores).
  • Activities in South Africa that are not present in this EBSA include: alien invasive species, beach seining, benthic (hake) longlining, dredge spoil dumping, gillnetting, kelp harvesting, mariculture, midwater trawling, naval dumping (ammunition), oil and gas (exploration and production), ports and harbours, prawn trawling, small pelagics fishing, south coast rock lobster harvesting, squid fishing, tuna pole fishing, inshore trawling, offshore trawling, and west coast rock lobster harvesting.

 

Map of cumulative pressure from all activities in the EBSA and surrounds. Darker reds indicate higher pressure intensity.

 

Pressure (in arbitrary cumulative pressure units, CPUs) summed for each pressure in the EBSA, per proposed EBSA biodiversity zone, ranked left (highest) to right (lowest) by the overall relative importance of pressures in this EBSA. Note that pressures from coastal disturbance to prawn trawling each comprise <1% of the EBSA pressure profile.

[Top]

 

Management Interventions Needed for the EBSA

Improved place-based protection of EBSA features should be pursued. In support of this, the EBSA is divided into a Biodiversity Conservation Zone and an Environmental Impact Management Zone, both comprising several areas within the EBSA. The aim of the Biodiversity Conservation Zone is to secure core areas of key biodiversity features in natural / near-natural ecological condition. Strict place-based biodiversity conservation is thus directed at securing key biodiversity features in a natural or semi-natural state, or as near to this state as possible. Activities or uses that have significant biodiversity impacts are incompatible with the management objective of this zone. If the activity is permitted, it would require alternative Biodiversity Conservation Zones or offsets to be identified. If this is not possible, it is recommended that the activity is Prohibited. Where possible and appropriate, the Biodiversity Conservation Zones should be considered for formal protection e.g., Marine Protected Areas or Other Effective Area-Based Conservation Measures (OECM). The aim of the Environmental Impact Management Zone is to manage negative impacts on key biodiversity features where strict place-based measures are not practical or not essential. In this zone, the focus is management of impacts on key biodiversity features in a mixed-use area, with the objective to keep biodiversity features in at least a functional state. Activities or uses that have significant biodiversity impacts should be strictly controlled and/or regulated. Within this zone, ideally there should be no increase in the intensity of use or the extent of the footprint of activities that have significant biodiversity impacts. Where possible, biodiversity impacts should be reduced.

As far as possible, the Biodiversity Conservation Zone was designed deliberately to avoid conflicts with existing activities. There are also six MPAs that are wholly or partially within the EBSA: Dwesa-Cwebe MPA; Hluleka MPA; Trafalgar MPA; Pondoland MPA; Protea Banks MPA; and Aliwal Shoal MPA. The activities permitted within these MPAs are not considered as part of the EBSA management recommendations because these are as per their respective gazetted regulations, which are available here: Dwesa-Cwebe MPA; Hluleka MPA; Trafalgar MPA; Pondoland MPA; Protea Banks MPA; and Aliwal Shoal MPA.

 

Proposed zonation of the EBSA into Conservation (medium green) and Impact Management (light green) Zones. MPAs are overlaid in orange outlines, with the extent within the EBSA given in dark green. Click on each of the zones to view the proposed management recommendations.

 

Protection of features in the rest of the Conservation Zone may require additional Marine Protected Area declaration/expansion. Other effective conservation measures should also be applied via Marine Spatial Planning (MSP) to ensure that the existing activities/uses are appropriately controlled to ensure compatibility of activities with the environmental requirements for achieving the management objectives of the EBSA Biodiversity Conservation and Environmental Impact Management Zones.

Based on the compatibility of sea-use activities with the management objective of each EBSA zone (see table below, from the sea-use guidelines of the National Coastal and Marine Spatial Biodiversity Plan), it is recommended for MSP that compatible activities are managed as General activities, which are those that are permitted and regulated by current general rules and legislation. Activities that are conditional are recommended to be managed as Consent activities, which are those that can continue in the zone subject to specific regulations and controls, e.g., to avoid unacceptable impacts on biodiversity features, or to avoid intensification or expansion of impact footprints of uses that are already occurring and where there are no realistic prospects of excluding these activities. Activities that are not compatible are recommended to be Prohibited, where such activities are not allowed or should not be allowed (which may be through industry-specific regulations) because they are incompatible with maintaining the biodiversity objectives of the zone. These recommendations are subject to stakeholder negotiation through the MSP process, recognizing that there will likely need to be significant compromises among sectors. It is emphasized, as noted above, that if activities that are not compatible with the respective EBSA zones are permitted, it would require alternative Biodiversity Conservation Zones or offsets to be identified. If this is not possible, it is recommended that the activity is Prohibited.

 

List of all sea-use activities, grouped by their Marine Spatial Planning (MSP) zones, and scored according to their compatibility with the management objective of the EBSA’s Biodiversity Conservation Zone (i.e., Critical Biodiversity Area, CBA) and Environmental Impact Management Zone (i.e., Ecological Support Area, ESA). Activity compatibility is given as Y = yes, compatible, C = conditional or N = not compatible, with major activities that are present in the EBSA shaded in grey.

There are also some pressures on biodiversity features within the EBSA that originate from activities outside of these EBSA or beyond the jurisdiction of MSP. In support of maintaining the ecological integrity of and benefits delivered by the key biodiversity features, these other activities need to be appropriately managed by complementary initiatives.

 

Recommendations for other activities beyond the jurisdiction of MSP management to support securing key biodiversity features within the EBSA.

[Top]

 

Activity Evaluation Per Zone: Zoning Feasibility

Proposed zonation of the EBSA, with the cumulative intensity footprint of activities within the EBSA (sorted highest to lowest) given relative to the national footprint of those activities to illustrate feasibility of management interventions.

Even though almost half of the country’s bather protection (shark netting) takes place within this EBSA, it is very well managed (particularly during the sardine run). Most shark netting is within the Impact Management Zone and the newly proclaimed/expanded MPAs, with a very small portion in the Conservation Zone. It is recommended to continue in both EBSA zone as a Consent activity. Most of the other activities that take place within the EBSA are coastal and primarily affect the shores and adjacent inner shelf in some cases. Coastal harvesting and fishing activities include subsistence harvesting, recreational shore angling, oyster harvesting, linefishing (commercial and recreational) and abalone harvesting. These activities are recommended to continue as Consent activities in both EBSA zones, noting that some of these activities fall in the newly proclaimed/expanded MPAs and, in those areas, will be managed according to the respective MPA regulations. Further, abalone harvesting is currently not present in the Impact Management Zone and is thus recommended to be Prohibited. Mining also takes place within the EBSA, with all currently mined sites either wholly or partially in the MPAs; it is present in only one site in the Conservation Zone, spanning the estuary and beach in this area and the adjacent Hluleka MPA. Shipping is recommended to continue under current general rules and legislation. Thus, in all cases, the EBSA zonation has no or minimal impact on the national footprint for the listed marine activities.

There are also several activities that are largely outside the EBSA but have downstream impacts to the biodiversity within the EBSA, e.g., from mean annual runoff reduction, coastal development, coastal disturbance, and wastewater discharge. The impacts should be managed, but principally fall outside the direct management and zoning of the EBSA. These existing activities are proposed as Consent activities for both EBSA zones, recognising that they should ideally be dealt with in complementary integrated coastal zone management in support of the EBSA. For example, investment in eradicating the alien invasive species could aid in improving the ecological condition of rocky and mixed shores, improving benefits for subsistence and recreational harvesting; and rehabilitation of degraded dunes and formalising access points could support improved habitat for nesting shorebirds, and enhanced benefits for coastal protection during storm surges. Similarly, improved estuary management through development of appropriate freshwater flow requirements, estuarine management plans and wastewater management regulations can improve the ecological condition of the surrounding marine environment, in turn, improving water quality and safe conditions for human recreation.

 

Management recommendations for MPAs

Since the inception of the MARIMSA Project, protection has increased in the EBSA with the declaration of the Protea Banks MPA and expanded Aliwal Shoal MPA in 2019. This builds on existing protection already afforded by the Dwesa-Cwebe, Hluleka, Pondoland and Trafalgar MPAs and land-based protected areas in the area. It is recommended that existing management is strengthened in the older MPAs, and that full operationalisation of the new MPAs is implemented, including management plans, resourcing, and adequate staffing and law enforcement. Potential MPA expansion within the EBSA should be explored to ensure that the features for which the EBSA was described receive adequate protection. See Future Process below for more details.

 

Existing and new marine protected areas (MPAs) in the Protea Banks and Sardine Route EBSA. Land-based protected areas are also shown (from DFFE, 2021).

[Top]

Management recommendations for MSP

Developing the biodiversity sector’s input to the national Marine Spatial Planning process

Following the initial management recommendations proposed for Protea Banks and Sardine Route, outlined above, South Africa iteratively developed a National Coastal and Marine Spatial Biodiversity Plan (NCMSBP; Harris et al. 2022a,b) that underpinned the Marine Biodiversity Sector Plan (DFFE 2022). The latter constitutes the biodiversity sector’s input into the national Marine Spatial Planning (MSP) process. The NCMSBP comprises a Map of Critical Biodiversity Areas and Ecological Support Areas (abbreviated to CBA Map), and a set of sea-use guidelines that indicate activity compatibility with the management objectives of each of the CBA Map categories. These two components form the basis for the proposed biodiversity zones and management recommendations for the Marine Area Plans. EBSAs are an integral part of the NCMSBP, and thus the Biodiversity Sector Plan. Therefore, these products informed the proposed zoning and sea-use guidelines for EBSAs in the MSP process.

 

Schematic diagram illustrating that the National Coastal and Marine Spatial Biodiversity Plan will inform the Marine Area Plans through the Marine Biodiversity Sector Plan (DFFE 2022), and will be iteratively updated and refined based on feedback. The process for deriving the sea-use guidelines is also shown, indicating that it is based on an assessment of activity compatibility with the management objective of Critical Biodiversity Area (CBA) Natural, CBA Restore and Ecological Support Areas (ESAs). Marine Protected Area (MPA) expansion, focussing on CBAs, will also take place in a separate but related process. The outcomes of the Marine Spatial Planning and MPA expansion processes will be incorporated into the Marine Area Plans and will be fed back into future updates of the National Coastal and Marine Spatial Biodiversity Plan.

[Top]

Proposed Zones

The proposed biodiversity zones for the Protea Banks and Sardine Route EBSA in MSP comprises two types: a Strict Biodiversity Conservation Zone; and a Biodiversity Impact Management Zone. The former has three sub-categories: Marine Protected Area; Biodiversity Conservation Area; and Biodiversity Restoration Area. All of these zones and sub-categories are found in Protea Banks and Sardine Route.

 

There are six MPAs in this EBSA: Dewsa-Cwebe, Hluleka, Pondoland, Trafalgar, Protea Banks, and Aliwal Shoal. They are managed according to their respective gazetted management regulations. The rest of the Strict Biodiversity Conservation Zone is primarily a Biodiversity Conservation Area, where the management objective of this zone is to maintain the sites in natural or near-natural ecological condition. A much smaller portion comprises a Biodiversity Restoration Area, where the management objective of the zone is to improve the ecological condition of the sites and, in the long term, restore them to a natural / near-natural state, or as near to that state as possible. As a minimum, avoid further deterioration in ecological condition and maintain options for future restoration. The rest of the EBSA is a Biodiversity Impact Management Zone. This is a multi-use area that may already be heavily impacted, but needs to be kept ecologically functional because it is still important for marine biodiversity patterns, ecological processes, and ecosystem services. Therefore, the management objective is to avoid further deterioration in ecological condition.

 

Proposed biodiversity zones for the Protea Banks and Sardine Route EBSA for South Africa’s Marine Area Plans.

 

Proposed Sea-Use Guidelines

All sea-use activities were listed and evaluated according to their compatibility with the management objective of each of the proposed biodiversity zones. Where various aspects of an activity have a different impact on the environment, these were reflected separately, e.g., impacts from petroleum exploration are different to those from production. Activity compatibility was based largely on the ecosystem-pressure matrix from the NBA 2018 (Sink et al. 2019), which is a matrix of expert-based scores of the functional impact and recovery time for each activity on marine ecosystems (adapted from Halpern et al. 2007). Activities were then classified into those that are Compatible, Not Compatible or have Restricted Compatibility with the management objectives of each proposed biodiversity zone. This classification followed a set of predefined principles that account for the severity and extent of impact, similar to the IUCN Red List of Ecosystems criterion C3 (Keith et al. 2013). Some exceptions and adjustments were made based on initial discussions as part of the MSP process.

 

Sea-use guidelines for Protea Banks and Sardine Route. List of all sea-use activities, grouped by their broad sea use and Marine Spatial Planning (MSP) Zones, and categorised according to their compatibility with the management objective of Strict Biodiversity Conservation Zone: Biodiversity Conservation Area (SBCZ: BCA); Strict Biodiversity Conservation Zone: Biodiversity Restoration Area (SBCZ: BRA); and the Biodiversity Impact Management Zone (BIMZ). Activity compatibility is given as Y = yes, compatible, R = restricted compatibility, or N = not compatible. Strict Biodiversity Conservation Zone: Marine Protected Areas (SBCZ: MPA) are managed according to their gazetted regulations.

 

Proposed management recommendations for activities with each of the different compatibility ratings:

  • Compatible: Activities should be allowed and regulated by current general rules. Notwithstanding, there should still be duty of care, possibly requiring monitoring and evaluation programmes, to avoid unintended cumulative impacts to the biodiversity features for which this area is recognised.
  • Restricted compatibility: A robust site-specific, context-specific assessment is required to determine the activity compatibility depending on the biodiversity features for which the site was selected. Particularly careful attention would need to be paid in areas containing irreplaceable to near-irreplaceable features where the activity may be more appropriately evaluated as not permitted. The ecosystem types in which the activities take place may also be a consideration as to whether or not the activity should be permitted, for example. Where it is permitted to take place, strict regulations and controls over and above the current general rules and legislation would be required to be put in place to avoid unacceptable impacts on biodiversity features. Examples of such regulations and controls include: exclusions of activities in portions of the zone; avoiding intensification or expansion of current impact footprints; additional gear restrictions; and temporal closures of activities during sensitive periods for biodiversity features.
  • Not compatible: The activity should not be permitted to occur in this area because it is not compatible with the management objective. If it is considered to be permitted as part of compromises in MSP negotiations, it would require alternative Strict Biodiversity Conservation Zones and/or offsets to be identified. However, if this is not possible, it is recommended that the activity remains prohibited within the Strict Biodiversity Conservation Zone.

[Top]

 

Research Needs

There are no specific research needs for this EBSA in addition to those for all EBSAsHowever, it is noted that there is planned research in the Protea Banks area through the African Coelacanth Ecosystem Program Phase III. Biodiversity sampling in the deeper portions of the EBSA and improved understanding of habitat sensitivity and vulnerability are emphasised as particular research priorities for this site.


Future Process

There needs to be full operationalisation and practical implementation of the Protea Banks MPA and the Aliwal Shoal MPA, including management plans, staffing, and resources. There also needs to be full operationalisation and practical implementation of the proposed zoning in the national marine spatial plan, with gazetted management regulations following the proposed management recommendations outlined above. Possible MPA expansion within the EBSA should be explored, with relevant areas included into focus areas that can be considered further in a dedicated MPA expansion process with adequate and meaningful stakeholder engagement. Further alignment between land-based and marine biodiversity priorities should also be strengthened, e.g., through the cross-realm planning in the CoastWise project. This EBSA is also part of a World Heritage Site proposal that is being developed.

 

References

DFFE, 2021. South African Protected Areas Database (SAPAD). Available at: https://egis.environment.gov.za/protected_and_conservation_areas_database.

DFFE, 2022. Biodiversity Sector Plan: Input for Marine Spatial Planning (MSP). Department of Forestry, Fisheries and the Environment, Cape Town.

Halpern, B.S., Selkoe, K.A., Micheli, F., Kappel, C.V., 2007. Evaluating and Ranking the Vulnerability of Global Marine Ecosystems to Anthropogenic Threats. Conservation Biology 21, 1301–1315.

Harris, L.R., Holness, S.D., Kirkman, S.P., Sink, K.J., Majiedt, P., Driver, A., 2022. National Coastal and Marine Spatial Biodiversity Plan Version 1.2 (Released: 12-04-2022). Nelson Mandela University, Department of Forestry, Fisheries and the Environment, and South African National Biodiversity Institute, South Africa.

Harris, L.R., Holness, S.D., Kirkman, S.P., Sink, K.J., Majiedt, P., Driver, A., in review. A robust, systematic approach for developing the biodiversity sector’s input for multi-sector Marine Spatial Planning. Ocean & Coastal Management.

Keith, D.A., Rodríguez, J.P., Rodríguez-Clark, K.M., Nicholson, E., Aapala, K., Alonso, A., Asmussen, M., Bachman, S., Basset, A., Barrow, E.G., Benson, J.S., Bishop, M.J., Bonifacio, R., Brooks, T.M., Burgman, M.A., Comer, P., Comín, F.A., Essl, F., Faber-Langendoen, D., Fairweather, P.G., Holdaway, R.J., Jennings, M., Kingsford, R.T., Lester, R.E., Nally, R.M., McCarthy, M.A., Moat, J., Oliveira-Miranda, M.A., Pisanu, P., Poulin, B., Regan, T.J., Riecken, U., Spalding, M.D., Zambrano-Martínez, S., 2013. Scientific Foundations for an IUCN Red List of Ecosystems. PLoS ONE 8, e62111.

Sink, K.J., Holness, S., Skowno, A.L., Franken, M., Majiedt, P.A., Atkinson, L.J., Bernard, A., Dunga, L.V., Harris, L.R., Kirkman, S.P., Oosthuizen, A., Porter, S., Smit, K., Shannon, L., 2019. Chapter 7: Ecosystem Threat Status, In South African National Biodiversity Assessment 2018 Technical Report Volume 4: Marine Realm. eds K.J. Sink, M.G. van der Bank, P.A. Majiedt, L.R. Harris, L.J. Atkinson, S.P. Kirkman, N. Karenyi. South African National Biodiversity Institute, Pretoria. http://hdl.handle.net/20.500.12143/6372.

[Top]